Toos Gas Field Development Project

Toos Gas Field Development Project

Employer: Iranian Central Oil Fields Company (ICOFC) Project Status: Completed

Project Summary :  This project has been on the go since May 2021 with the aim of carrying out conceptual studies, basic/FEED, ancillary services, preparation of EPC tender documents.

Toos Gas Field is located 100 kilometers northeast of Mashhad, northeast Iran, and 60 kilometers southwest of Sarakhs County. This field is near the gas fields of Khangiran and Gonbadli.
Project start date: May 2021
Operator: Petro Sahel Ofogh Kish (PESOK)
Project description:
  - The mentioned contract is in the form of a package in two sections of surface and underground.
Underground:
  - Estimating the time and cost of drilling, preparing underground tender documents, estimating the cost and time of conducting a comprehensive study and presenting the field’s development plan.
Surface:
  - Conducting conceptual studies
  - Performing FEED (Front End Engineering Design)
  - Preparation of EPC Tender Packages Documents for construction of the access road and location of the well, wellhead facilities, transmission pipelines of the wells, the Toos Field collection center along with the units supplying the ancillary needs and the collected gas transmission pipeline to the interconnector at the CMF of Khangiran Refinery and also the sweet gas pipelines sent from the CMF to the Toos Field collection center and the wells along with the required facilities within the scope of the job description requested by the client.

tags projects
The South Pars oil layers development project started in 2004 with the aim of producing 25,000 barrels/day of crude oil.
At the present a subsidiary company of Petroiran ,on behalf of Petroiran company has entered into contract with Iranian Offshore Oil Company (IOOC)...
Construction and installation of infrastructures (jackets) and pipelines in Forouzan Fields which started in 2008.
The Salman field development project started in 2000 with the aim of increasing oil production by 50,000 barrels per day and producing 540 million cub...
The development plan of Forozan and Esfandiar fields started in 2002 with the aim of increasing oil production by 50,000 b/d.
The development plan of Jofeir Oil Field started in 2008 with the aim of early production of 3,500 barrels/day of crude oil and 1.7 million cubic feet...
The Azadegan oil field development project started in 2003 with the aim of early production of 50,000 barrels of oil per day.
This pipeline is the longest gas transmission pipeline from the offshore sector to the onshore facilities of South Pars in Asalouyeh port.
The development plan of Nusrat and Farzam fields started in 2000 with the aim of increasing oil production by 16,450 barrels per day.
Construction of the Middle East’s first FPSO by Petro-Iran Development Company
The project started in 2005 with the aim of developing the gas field by drilling an appraisal well and providing ancillary services.
The project contract was signed in 2013 with the aim of drilling and completing 11 appraisal and development gas wells.
Providing integrated drilling services for 10 drilling rigs operated by Iranian Offshore Oil Company (IOOC)
Providing integrated drilling services for 15 offshore drilling rigs and 3 onshore drilling rigs operated by IOOC
The project started in 2015 with the aim of increasing the capacity of Abuzar gas transmission to Darood II facility in Kharg Island
Address : No. 20, Tabrizian st, Dastgerdi (Zafar) St., Shariati Ave., Tehran-Iran
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
Address : No. 20, Next To Shahid AmirSoheil Tabrizian Alley, Shahid Dastgerdi (Ex Zafar) Street, Shariati Street,
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
Address : No. 20, Next To Shahid AmirSoheil Tabrizian Alley, Shahid Dastgerdi (Ex Zafar) Street, Shariati Street,
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
qrcode
© copyright 2018 Petroiran. All rights reserved
Design By ParsianGroup.com