Projects
  • Home
  • Projects
  • Provision of Integrated Drilling Services (IDS-1)
Provision of Integrated Drilling Services (IDS-1)

Provision of Integrated Drilling Services (IDS-1)

Employer: Iranian Offshore Oil Company (IOOC) Project Status: Completed

Project Summary :  Providing integrated drilling services for 15 offshore drilling rigs and 3 onshore drilling rigs operated by IOOC

Project start date: 2010
Client: Iranian Offshore Oil Company 
Type of contract: Technical and Drilling Services
Developer : Drilling Company International
Project description:
  - Providing drilling services, including directional drilling, cementing, drilling fluids, liner hanger installation, fishing, driving casing, liner and coiled tubing, drilling window opening, geotechnical and geophysical, H2S and coiled tubing and acid work as well as wellhead services.
  - Providing management services and performing support operations, including the provision of vessels and services.

tags projects
The South Pars oil layers development project started in 2004 with the aim of producing 25,000 barrels/day of crude oil.
At the present a subsidiary company of Petroiran ,on behalf of Petroiran company has entered into contract with Iranian Offshore Oil Company (IOOC)...
Construction and installation of infrastructures (jackets) and pipelines in Forouzan Fields which started in 2008.
The Salman field development project started in 2000 with the aim of increasing oil production by 50,000 barrels per day and producing 540 million cub...
The development plan of Forozan and Esfandiar fields started in 2002 with the aim of increasing oil production by 50,000 b/d.
The development plan of Jofeir Oil Field started in 2008 with the aim of early production of 3,500 barrels/day of crude oil and 1.7 million cubic feet...
The Azadegan oil field development project started in 2003 with the aim of early production of 50,000 barrels of oil per day.
This pipeline is the longest gas transmission pipeline from the offshore sector to the onshore facilities of South Pars in Asalouyeh port.
The development plan of Nusrat and Farzam fields started in 2000 with the aim of increasing oil production by 16,450 barrels per day.
Construction of the Middle East’s first FPSO by Petro-Iran Development Company
The project started in 2005 with the aim of developing the gas field by drilling an appraisal well and providing ancillary services.
The project contract was signed in 2013 with the aim of drilling and completing 11 appraisal and development gas wells.
Providing integrated drilling services for 10 drilling rigs operated by Iranian Offshore Oil Company (IOOC)
The project started in 2015 with the aim of increasing the capacity of Abuzar gas transmission to Darood II facility in Kharg Island
The project started in 2018 with the aim of increasing production from the wells by 16,000 b/d
Address : No. 20, Tabrizian st, Dastgerdi (Zafar) St., Shariati Ave., Tehran-Iran
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
Address : No. 20, Next To Shahid AmirSoheil Tabrizian Alley, Shahid Dastgerdi (Ex Zafar) Street, Shariati Street,
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
Address : No. 20, Next To Shahid AmirSoheil Tabrizian Alley, Shahid Dastgerdi (Ex Zafar) Street, Shariati Street,
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
qrcode
© copyright 2018 Petroiran. All rights reserved
Design By ParsianGroup.com