Projects
BInak Oil Field Development Plan

BInak Oil Field Development Plan

Employer: National Iranian South Oil Company (NISOC) Project Status: Ongoing

Project Summary :  This project started in 2019 with the aim of enhancing production by 12,500 barrels of crude oil per day

Binak Oil Field is located in Bushehr province, 20 kilometers northwest of Genaveh County, on the coast of the Persian Gulf. This field is adjacent to Golkhari Oil Field, Bibi Hakimeh Oil Field and Siahmakan Oil Field from the north and Khark Oil Field from the south.
Project start date: 2020 
Developer: Petro-Iran Development Company (PEDCO)
Project description:
  - Construction of the access road and drilling 6 new wells
  - Repairing the access road and repairing the site of 4 existing wells
  - Construction of about 20 kilometers of transmission pipelines
  - Drilling 6 new wells in Bangestan and Asmari reservoirs
  - Workover of 4 existing wells of Bangestan Reservoir
  - Construction of 44 kilometers of 8-inch gas pipeline from Binak gas pressure boosting station to Siahmakan gas injection station and 5.2 kilometers of 4-inch pipeline to transfer gaseous liquids from Binak gas pressure boosting station to Binak operation zone
  - Construction of a gas concentration train at the Binak collection station with an approximate capacity of 15 mcf/d (to prevent gas flaring)
Project goals: Production enhancement by 12,500 b/d of crude oil

tags projects
The South Pars oil layers development project started in 2004 with the aim of producing 25,000 barrels/day of crude oil.
At the present a subsidiary company of Petroiran ,on behalf of Petroiran company has entered into contract with Iranian Offshore Oil Company (IOOC)...
Construction and installation of infrastructures (jackets) and pipelines in Forouzan Fields which started in 2008.
The Salman field development project started in 2000 with the aim of increasing oil production by 50,000 barrels per day and producing 540 million cub...
The development plan of Forozan and Esfandiar fields started in 2002 with the aim of increasing oil production by 50,000 b/d.
The development plan of Jofeir Oil Field started in 2008 with the aim of early production of 3,500 barrels/day of crude oil and 1.7 million cubic feet...
The Azadegan oil field development project started in 2003 with the aim of early production of 50,000 barrels of oil per day.
This pipeline is the longest gas transmission pipeline from the offshore sector to the onshore facilities of South Pars in Asalouyeh port.
The development plan of Nusrat and Farzam fields started in 2000 with the aim of increasing oil production by 16,450 barrels per day.
Construction of the Middle East’s first FPSO by Petro-Iran Development Company
The project started in 2005 with the aim of developing the gas field by drilling an appraisal well and providing ancillary services.
The project contract was signed in 2013 with the aim of drilling and completing 11 appraisal and development gas wells.
Providing integrated drilling services for 10 drilling rigs operated by Iranian Offshore Oil Company (IOOC)
Providing integrated drilling services for 15 offshore drilling rigs and 3 onshore drilling rigs operated by IOOC
The project started in 2015 with the aim of increasing the capacity of Abuzar gas transmission to Darood II facility in Kharg Island
Address : No. 20, Tabrizian st, Dastgerdi (Zafar) St., Shariati Ave., Tehran-Iran
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
Address : No. 20, Next To Shahid AmirSoheil Tabrizian Alley, Shahid Dastgerdi (Ex Zafar) Street, Shariati Street,
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
Address : No. 20, Next To Shahid AmirSoheil Tabrizian Alley, Shahid Dastgerdi (Ex Zafar) Street, Shariati Street,
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
qrcode
© copyright 2018 Petroiran. All rights reserved
Design By ParsianGroup.com