Employer: Iranian Offshore Oil Company (IOOC) Project Status: Completed

Project Summary :  Construction and installation of infrastructures (jackets) and pipelines in Forouzan Fields which started in 2008.

Forouzan Oil Field is located in the Persian Gulf. This field is one of the joint fields located on the sea border of Iran and Saudi Arabia and 100 km southwest of Kharg Island
Project start date: 2008
Type of contract: EPC
Project description:
    - Design, construction and installation of FZ-A infrastructure
    - Design, construction and installation of FY-A infrastructure
    - Design, construction, installation and pre-commissioning of a 24-inch sea pipeline with an approximate length of 102 kilometers with a transfer capacity of 258 million cubic feet gas from FZ-A platform to Kharg Island
    - Design, construction, installation and pre-commissioning of about 54 kilometers of pipelines in the field
Completed Works:
    - Engineering, construction and installation of two substructures
    - Design, construction, installation and pre-commissioning of a 24-inch marine pipeline with an approximate length of 102 km
    - Design, construction, installation and pre-commissioning of about 54 kilometers of pipelines in the field


tags projects
The South Pars oil layers development project started in 2004 with the aim of producing 25,000 barrels/day of crude oil.
At the present a subsidiary company of Petroiran ,on behalf of Petroiran company has entered into contract with Iranian Offshore Oil Company (IOOC)...
The Salman field development project started in 2000 with the aim of increasing oil production by 50,000 barrels per day and producing 540 million cub...
The development plan of Forozan and Esfandiar fields started in 2002 with the aim of increasing oil production by 50,000 b/d.
The development plan of Jofeir Oil Field started in 2008 with the aim of early production of 3,500 barrels/day of crude oil and 1.7 million cubic feet...
The Azadegan oil field development project started in 2003 with the aim of early production of 50,000 barrels of oil per day.
This pipeline is the longest gas transmission pipeline from the offshore sector to the onshore facilities of South Pars in Asalouyeh port.
The development plan of Nusrat and Farzam fields started in 2000 with the aim of increasing oil production by 16,450 barrels per day.
Construction of the Middle East’s first FPSO by Petro-Iran Development Company
The project started in 2005 with the aim of developing the gas field by drilling an appraisal well and providing ancillary services.
The project contract was signed in 2013 with the aim of drilling and completing 11 appraisal and development gas wells.
Providing integrated drilling services for 10 drilling rigs operated by Iranian Offshore Oil Company (IOOC)
Providing integrated drilling services for 15 offshore drilling rigs and 3 onshore drilling rigs operated by IOOC
The project started in 2015 with the aim of increasing the capacity of Abuzar gas transmission to Darood II facility in Kharg Island
The project started in 2018 with the aim of increasing production from the wells by 16,000 b/d
Address : No. 20, Tabrizian st, Dastgerdi (Zafar) St., Shariati Ave., Tehran-Iran
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
Address : No. 20, Next To Shahid AmirSoheil Tabrizian Alley, Shahid Dastgerdi (Ex Zafar) Street, Shariati Street,
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
Address : No. 20, Next To Shahid AmirSoheil Tabrizian Alley, Shahid Dastgerdi (Ex Zafar) Street, Shariati Street,
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
qrcode
© copyright 2018 Petroiran. All rights reserved
Design By ParsianGroup.com