Skip navigation links
Home
Our Company
Projects
Tenders
Job Opportunities
Contacts
Iran Cumulative Production of SPOL Exceeds 4.7mb

Production ِDirector of IOOC Mohammad Hossein Daneshfar told Shana that all the oil produced from the field has been exported so far.

 

He said the 9th oil consignment from the field has been loaded by the floating production storage and offloading (FPSO) that is operating at the offshore field.

 

"The consignment was loaded on Tuesday and the 10th one is scheduled for mid-December," Daneshfar said.

 

Iran started trial-run production of SPOL on March 20 2017 but Iranian President Hassan Rouhani inaugurated the project in a ceremony on Sunday, April 16 2017.

 

The project is being developed under the newly-devised model of oil contracts, also known as Iran Petroleum Contract (IPC).

Iran Cumulative Production of SPOL Exceeds 4.7mb
Created Date: Saturday, December 02, 2017 10:05 AM

Title

Short Body

Body

S_Picture

Group

Source

Expires

Priority

Attachments
Content Type: Announcement
Created at by
Last modified at by
Copyright © 2010 PEDCO ICT Department - All Rights Reserved